Search
Close this search box

INTRODUCTION

Architecture & EPC Services for Data Science, AI & Emerging Technologies Campuses

GPU clusters carry power and cooling loads closer to a small data centre than a standard classroom, so this school’s electrical and HVAC infrastructure has to be sized from the structural stage. EROCON designs B.Tech/B.Sc. Data Science campuses across India with data-centre-grade MEP sizing built in.

 

Our architecture and MEP coordination treats GPU and HPC labs as data-centre-grade spaces from the design stage, and EROCON delivers the electrical and cooling infrastructure to that specification.

Demand for data science and AI talent in India has outpaced supply for several years running, with industry reports pointing to a shortfall of hundreds of thousands of skilled professionals nationwide.

Services for Data Science, AI & Emerging Technologies Campuses

Regulatory Framework We Design To

AICTE (where offered under the B.Tech umbrella) and UGC. GPU clusters carry heavy power and cooling loads, so this lab is designed as a small data-centre for MEP sizing purposes, not a standard classroom.

Common Questions About Data Science, AI & Emerging Technologies Design

Why does a GPU lab need special electrical planning?

GPU clusters carry power and cooling loads closer to a small data-centre than a classroom. This has to be engineered at the structural and electrical design stage, or the lab simply can’t run the equipment it was built for.

 

Can the Data Centre be shared with another school?

Yes, it’s commonly shared with the School of Computer Science & IT on the same campus rather than duplicated, saving both cost and floor area.

 

What supports robotics and AI teaching specifically?

An AI & Robotics Lab with open floor space for robotic-arm movement, distinct from a standard fixed-workstation computer lab.

EROCON Architecture + EPC Services

EROCON’s architecture and MEP coordination treats GPU and HPC labs as data-centre-grade spaces from the design stage, and EROCON delivers the electrical and cooling infrastructure to that specification, so the lab can actually run the equipment it was designed for.

Request a consultation

Talk to EROCON about your Data Science / AI College Project.